Theory of Constraints Handbook - James Cox Iii [740]
nurse’s
personal
personal productivity
poor grades
rules
training hours
white-collar burnout
direct costing
direct costs
direct/variable costing
disaggregation
disciple making
Dismukes, J. P.
disruptions
disruptive students
distribution
five questions applied to
idea flows obligations in
retail
solution
S&T
TDD of
TDD performance and
TOC and
workload of
divergence point
diversification
Divr, D.
DMADV. See Define-Measure-Analyze-Design-Verify
DMAIC. See Define-Measure-Analyze-Improve-Control
doctor unit time (DU)
doctor/patient communication
doctor’s perspective
doctor’s time scheduled
done, what is
double subordination
DPMO. See defects per million opportunities
drinking age dilemma
dropouts
Drucker, P. F.
drug trafficking
drum utilization
Drum-Buffer-Rope (DBR)
5FS used for
background perspective on
buffer of
capacity constraints identified in
case study of
in complex organizations
defining
drum of
expected completion times in
flow emphasis challenging
flow management in
illustration of
in A-plants
in I-plants
in T-plants
in V-plants
OPT and
precursor literature of
problems with
PSTS with
rope in
scheduling literature on
simulations of
solution direction and
system of
traditional methodology and
Drum-Buffer-Rope for Goods (DBRG)
Drum-Buffer-Rope for Services (DBRs)
DU. See doctor unit time
Duclos, L. K.
due date performance (DDP)
due dates
Dumond, E. J.
Dumond, J.
Dunbar, R.
Duncker, Karl
Dweck, Carol
Dynamic Buffer Management (DBM)
disabling
SDCs using
target levels increasing/decreasing in
using
dynamic buffers
dysfunctional behaviors
E
Earl, Ezra
earned value reporting
Earned Value System (EVS)
EBQ. See Economic Batch Quantity
EC. See Evaporating Cloud
EC-CRT(B)-FRT(B)-NBR method
Economic Batch Quantity (EBQ)
Economic Order Quantity (EOQ)
ECPs. See engineering change proposals
Eden, C.
Edison, Thomas
educators
effective mechanism
80-20 rule
Einstein, Albert
Eisenstat, R. A.
elephant items
elevate step
Elton, M.
empowerment
end products
endangered need
engineering change proposals (ECPs)
engines of disharmony/harmony
Enterprise Project Management (EPM)
Enterprise Resources Planning (ERP)
ASR and
POOGI not supported by
Throughput-driven rules from
enterprise-level
entities
entity clarity
entity existence
environment
for CS
MTA’s problematic
S-DBR fit and
S-DBR not suited for these
with S&T
EOQ. See Economic Order Quantity
EOQ(43) system
EPM. See Enterprise Project Management
ERP. See Enterprise Resources Planning
evaluation form
Evaporating Cloud (EC)
assumptions/conflicts and
assumptions/injections/core conflicts and
bank UDE and
college student dilemma and
communication dilemma in
conflict between opposing actions and
conflicts in
conflicts/assumptions and
constructing
defining
inherent conflict in
system performance and
template/hints for
training hours dilemma in
white-collar burnout dilemma and
EVS. See Earned Value System
execution
controlling
horizon
operations planning and
phase
S&T monitoring
Execution (Bossidy, Charan)
expectations
expected variation (green zone)
expert service launching
expertise
external reporting
F
Fabri, R.
failure
failure rate
family inclusion
Farah, K. S.
FASB. See Financial Accounting Standards Board
father-son relationships
chronic dilemmas in
conflicts in
co-op dilemma in
curfew dilemma in
dilemmas in
drinking age dilemma in
Las Vegas dilemma in
major issue dilemma in
poor grades dilemma in
rules dilemma in
Fawcett, S.
FCOs. See Field Change Orders
FDA. See Federal Drug Administration
Federal Drug Administration (FDA)
feedback
accountability systems and
government
information system and
loops
metrics and
of offenders
real-time system of
system
trainer
feeding buffers
Feldman, J. I.
fever charts
Field Change