Online Book Reader

Home Category

Theory of Constraints Handbook - James Cox Iii [121]

By Root 2649 0
S. 1994. “Does protective capacity assist managers in competing along time-based dimensions?” Production and Inventory Management Journal 35:53–59.

Atwater, J. B. and Chakravorty, S. S. 1996. “The impact of restricting the flow of inventory in serial production systems.” International Journal of Production Research 34:2657–2669.

Atwater, J. B. and Chakravorty, S. 2002. “A study of the utilization of capacity constrained resources in drum-buffer-rope systems,” Production and Operations Management 12:259–273.

Atwater, J. B., Stephens, A. A., and Chakravorty, S. S. 2004. “Impact of scheduling free goods on the throughput performance of a manufacturing operation,” International Journal of Production Research 42:4849–4869.

Balakrishnan, J. and Cheng, C. H. 2005. “The Theory of Constraints and the make-or-buy decision—An update and review,” Journal of Supply Chain Management 41:40–47.

Becker, C. and Scholl, A. 2006. “A survey on problems and methods in generalized assembly line balancing,” European Journal of Operational Research 168:694–715.

Belvedere, V. and Grando, A. 2005. “Implementing a pull system in batch/mix process industry through Theory of Constraints: A case study,” Human Systems Management 24:3–12.

Berry, R. and Smith, L. B. 2005. “Conceptual foundations for the Theory of Constraints,” Human Systems Management 24:83–94.

Betterton, C. E. and Cox III, J. F. 2009. “Espoused drum-buffer-rope flow control in serial lines: A comparative study of simulation models,” International Journal of Production Economics 117(1):66–79.

Betz, H. J. 1996. “Common sense manufacturing: A method of production control,” Production and Inventory Management Journal 37:77–81.

Blackstone, J. H., Jr. and Cox III, J. F. 2002. “Designing unbalanced lines—Understanding protective capacity and protective inventory,” Production Planning & Control 13:416–423.

Boorstin, D. 1965. The Americans: The National Experience. New York: Random House.

Boyd, L. and Gupta, M. 2004. “Constraints management: What is the theory?” International Journal of Operations and Production Management 24:350–371.

Chakravorty, S. S. 1996. “Robert Bowden, Inc.: A case study of cellular manufacturing and drum-buffer-rope implementation,” Production and Inventory Management Journal 37(3): 15–19.

Chakravorty, S. S. 2000. “Improving a V-plant operation: A window manufacturing case study,” Production and Inventory Management Journal 41(3):37–42.

Chakravorty, S. S. and Atwater, J. B. 1996. “A comparative study of line design approaches for serial production systems,” International Journal of Operations and Production Management 16(6):91–108.

Chakravorty, S. S. and Atwater, J. B. 2005. “The impact of free goods on the performance of drum-buffer-rope scheduling systems,” International Journal of Production Economics 95:347–357.

Coman, A., Koller, G., and Ronen, B. 1996. “The application of focused management in the electronics industry,” Production and Inventory Management Journal 37(2):63–70.

Conti, R. F. and Warner, M. 1997. “Technology, culture and craft: Job tasks and quality realities,” New Technology Work and Employment 12:123–135.

Conway, R. 1997. “Comments on an exposition of multiple constraint scheduling,” Production and Operations Management 6:23–24.

Corbett, T. and Csillag, J. 2001. “Analysis of the effects of seven drum-buffer-rope implementations,” Production and Inventory Management Journal 42(3):17–23.

Cox III, J. F., III and Spencer, M. 1998. The Constraints Management Handbook. Boca Raton, FL: St. Lucie Press.

Cox III, J. F., III and Walker, E. D., II. 2006. “The poker chip game: A multiproduct, multi-echelon, stochastic supply chain network useful for teaching the impacts of pull versus push inventory policies on link and chain performance,” Informs Transactions on Education 6(3):3–19.

Danos, G. 1996. “Dixie reengineers scheduling—And increases profit 300 percent,” APICS The Performance Advantage 3:28–31.

Demmy, W. S. and Demmy, B. S. 1994. “Drum-buffer-rope scheduling and pictures for the yearbook,

Return Main Page Previous Page Next Page

®Online Book Reader