Theory of Constraints Handbook - James Cox Iii [126]
Spencer, M. S. and Cox III, J. F. 1995. “Master production scheduling in a Theory of Constraints environment,” Production and Inventory Management Journal First Quarter:8–14.
Spencer, M. S. and Wathen, S. 1994. “Applying the Theory of Constraints’ process management technique to an administrative function at Stanley Furniture,” National Productivity Review July:379–385.
Srikanth, M. L. and Umble, M. M. 1997. Synchronous Management: Profit Based Manufacturing for the 21st Century, volume 1. Guilford: Spectrum, 235–298.
Steele, D. C., Philipoom, P. R., Malhotra, M. K., and Fry, T. D. 2005. “Comparisons between drum-buffer-rope and material requirements planning: A case study,” International Journal of Production Research 48:3181–3208.
Stein, R. E. 1996. Reengineering the Manufacturing System: Applying the Theory of Constraints (TOC). New York: Marcel Dekker.
Sugimori, Y., Kusunoki, K., Cho, F. and Uchikawa, S. 1977. “Toyota Production System and Kanban sytem: Materialization of just-in-time and respect-for-human system,” International Journal of Production Research 15:(6):553–564.
Sullivan, T. T., Reid, R. A., and Cartier, B. Editors. 2007. The TOCICO Dictionary. Theory of Constraints International Certification Organization. Available online at http://www.tocico.org/?page=dictionary.
Taylor III, L. J. 1999. “A simulation study of work-in-process inventory drive systems and their effect on financial measures,” Integrated Manufacturing Systems 10:306–315.
Taylor III, L. J. 2000. “A simulation study of work-in-process inventory drive systems and their effect on operational measures,” British Journal of Management 11:47–59.
Trietsch, D. 2005. “From management by constraints (MBC) to management by criticalities (MBC II),” Human Systems Management 24:105–115.
Tseng, M. E. and Wu, H. H. 2006. “The study of an easy-to-use DBR and BM system,” International Journal of Production Research 44:1449–1478.
Tu, Y. M. and Li, R. K. 1998. “Constraint time buffer determination model,” International Journal of Production Research 36:1091–1103.
Tyan, J. C., Chen, J. C., and Wang, F. K. 2002. “Development of a state-dependent dispatch rule using theory of constraints in near-real-world wafer fabrication,” Production Planning & Control 13:253–261.
Umble, M. and Srikanth, M. L. 1995. Synchronous Manufactuirng: Principles for World Class Excellence. Wallingford, CT: Spectrum.
Umble, M. M. and Umble, E. J. 1999. “Drum-buffer-rope for lower inventory,” Industrial Management September–October:24–33.
Umble, M., Umble, E., and Von Deylan, L. 2001. “Integrating Enterprise Resources Planning and Theory of Constraints: A case study,” Production and Inventory Management Journal 42(2):43–48.
Umble, M. M. and Umble, E. J. 2006. “Utilizing buffer management to improve performance in a healthcare environment,” European Journal of Operational Research 174:1060–1075.
Umble, M., Umble, E., and Murakami, S. 2006. “Implementing theory of constraints in a traditional Japanese manufacturing environment: The case of Hitachi Tool Engineering,” International Journal of Production Research 44:1863–1880.
Vaidyanathan, B. S., Miller, D. M., and Park, Y. H. 1998. “Application of discrete event simulation in production scheduling,” Proceedings of the 1998 Winter Simulation Conference 2:965–971.
Vermaak, W. and Ventner, D. Undated. “Using simulation and the Theory of Constraints to optimize materials handling systems.” http://login.totalweblite.com/Clients/doublearrow/beltcon2001/5.using simulation and the theory of constraints to optimize materials handling systems.pdf.
Villforth, R. 1994. “Applying constraint management theory in a wafer fab,” 1994 IEEE/SEMI Advanced Semiconductor Manufacturing Conference 175–178.
Walker, W. T. 2002. “Practical application of drum-buffer-rope to synchronize a two-stage supply chain,” Production and Inventory Management Journal 43(3):13–23.
Walker, W. T. 2005. “Emerging trends in supply chain