Theory of Constraints Handbook - James Cox Iii [125]
Reimer, G. 1991. “Material requirements planning and Theory of Constraints: Can they coexist? A case study,” Production and Inventory Management Journal Fourth Quarter:48–52.
Rerick, R. A. 1997. “Fab 6 pipeline constraint management implementation at Harris Semiconductor Corp.” Microelectronics Journal 28(2): viii–ix.
Riezebos, J., Korte, G. J., and Land, M. J. 2003. “Improving a practical DBR buffering approach using Workload Control,” International Journal of Production Research 41:699–712.
Rippenhagen, C. and Krishmaswamy, S. 1998. “Implementing the theory of constraints philosophy in highly reentrant systems,” Proceedings of the 1998 Winter Simulation Conference, 993–996.
Ronen, B. and Spector, Y. 1992. “Managing system constraints: A cost/utilization approach.” International Journal of Production Research 30:2045–2061.
Rose, E., Odom, R., Dunbar, R., and Hinchman, J. 1995a. “How TOC and TPM together to build the quality toolbox of SDWTs,” 1995 IEEE CMPT International Manufacturing Technology Symposium, 56–59.
Rose, E., Odom, R., Murphy, R., and Behnke, L. 1995b. “SDWT requires tools to be successful,” 1995 IEEE/SEMI Advanced Manufacturing Conference, 327–332.
Russell, G. R. and Fry, T. D. 1997. “Order review/release and lot splitting in drum-buffer-rope,” International Journal of Production Research 35:827–845.
Sale, M. L. and Inman, R. A. 2003. “Survey-based comparison of performance and change in performance of firms using traditional manufacturing, JIT and TOC,” International Journal of Production Research 41:829–844.
Schaefers, J., Aggounne, R., Becker, F., and Fabri, R. 2004. “TOC-based planning and scheduling model,” International Journal of Production Research 42:2639–2649.
Schragenheim, E., Cox, J. F., and Ronen, B. 1994. “Process flow industry—Scheduling control using the Theory of Constraints,” International Journal of Production Research 32:1867–1877.
Schragenheim, E. and Dettmer, H. W. 2001. Manufacturing at Warp Speed. Boca Raton, FL: St. Lucie Press.
Schragenheim, E., Dettmer, H. W., and Patterson, J. W. 2009. Supply Chain Management at Warp Speed. Boca Raton, FL: CRC Press.
Schragenheim, E. and Ronen, B. 1990. “Drum-buffer-rope shop floor control,” Production and Inventory Management Journal 31(3):18–23.
Schragenheim, E. and Ronen, B. 1991. “Buffer management: A diagnostic tool for production control,” Production and Inventory Management Journal 32(2):74–79.
Simatupang, T. M. 2000. Utilization of buffer management to build focused productive maintenance. Working paper. New Zealand: Massey University.
Simatupang, T. M., Wright, A. C., and Sridharan, R. 2004. “Applying the theory of constraints to supply chain collaboration,” Supply Chain Management: An International Journal 9:57–70.
Simons, Jr., J. V. and Simpson III, W. P. 1997. “An exposition of multiple constraint scheduling as implemented in the Goal System (formerly DisasterTM),” Production and Operations Management 6:3–22.
Simons, Jr., J. V., Simpson, W. P., Carlson, B. J., James, S. W., Lettiere, C. A., and Mediate, Jr., B. A. 1996. “Formulation and solution of the drum-buffer-rope constraint scheduling problem (DBRCSP),” International Journal of Production Research 34:2405–2420.
Smith, G. R., Herbein, W. C., and Morris, R. C. 1999. “Front-end innovation at AlliedSignal and Alcoa,” Research-Technology Management 42(6):15–24.
Sorensen, C. 1956. My Forty Years with Ford. New York: W. W. Norton & Company.
Spearman, M. L. 1997. “On the Theory of Constraints and the Goal System,” Production and Operations Management 6:28–33.
Spencer, M. S. 1991. “Using The Goal in an MRP system,” Production and Inventory Management Journal Fourth Quarter:22–27.
Spencer, M. S. 1994. “Economic theory, cost accounting and theory of constraints: An examination of relationships and problems,” International Journal of Production Research 32:299–308.
Spencer, M. S. and Cox III, J. F. 1994. “Optimum Production Technology (OPT) and the Theory of Constraints (TOC):