Newbold, R. 1999. Project Management in the Fast Lane: Applying the Theory of Constraints. Boca Raton, FL: St. Lucie Press.
Paige, H. W. 1963. “How PERT-cost helps the general manager,” Harvard Business Review 87–95.
Parkinson C. N. 1957. Parkinson’s Law and Other Studies in Administration. New York: Random House.
Payne, J. H. 1995. “Management of multiple simultaneous projects: A state-of-the-art review,” International Journal of Project Management 13(3):163–168.
Pinto, J. K. 1999. “Some constraints on the theory of constraints—Taking a critical look at the Critical Chain,” PM Network 13(8):49–51.
Pinto, J. K. and Mantel, S. J. 1990. “The causes of project failure,” IEEE Transactions on Engineering Management 37(4):269–275.
Pinto, J. K. and Presscott, D. P. 1988. “Project success: Definitions and measurement techniques,” Project Management Journal 19(1):67–71.
Pinto, J. K. and Slevin, D. P. 1987. “Critical factors in successful project implementation,” IEEE Transactions in Engineering Management EM-34(1):22–27.
Pinto, J. K. and Slevin, D. P. 1989. “The project champion: Key to implementation success,” Project Management Journal XX:15–20.
Pitagorsky, G. 2001. “A scientific approach to project management,” Machine Design 73(14): 78–82.
Pittman, P. H. 1994. Project management: A more effective methodology for the planning and control of projects. Unpublished doctoral diss., University of Georgia.
Platje, A. and Seidel, H. 1993. “Breakthrough in multiproject management: How to escape the vicious circle of planning and control,” International Journal of Project Management 11(4):209–213.
Pocock, J. W. 1962. “PERT as an analytical aid for program planning—Its payoff and problems,” Operations Research 10(6):893–903.
Rand, G. K. 2000. “Critical chain: The theory of constraints applied to project management,” International Journal of Project Management 18(3):173–177.
Raz, T., Divr, D., and Barnes, R. 2003. “A critical look at critical chain project management,” Project Management Journal 34(4):24–32.
Roseboom, J. H. 1961. “Comments on a paper by Thomas Healy,” Operations Research 909–910.
Rydell Group. 1995. TOC at Saturn and GM Dealers. Paper presented at the North American Jonah Upgrade Conference, September 21–24, Philadelphia, PA.
Schonberger, R. J. 1981. “Why projects are ‘always’ late: A rationale based on manual simulation of a PERT/CPM network,” Interfaces 11(5):66–70.
Sonawane, R. 2004. Applying systems dynamics and critical chain methods to develop a modern construction project management system. Unpublished master thesis, Texas A&M University–Kingsville.
Speranza, M. G. and Vercellis, C. 1993. “Hierarchial models for multi-project planning and scheduling,” European Journal of Operations Research 64(2):312–325.
Srinivasan, M. M., Best, W. D., and Chandrasekaren, S. 2007. “Warner Robins Air Logistics Center streamlines aircraft repair and overhaul.” Interfaces 37(1):7–21.
Steyn, H. 2000. “An investigation into the fundamentals of critical chain project scheduling,” International Journal of Project Management 19(6):363–369.
Steyn, H. 2002. “Project management applications of the theory of constraints beyond critical chain scheduling,” International Journal of Project Management 20(1):75–80.
Trietsch, D. 2005. “Why a critical path by any other name would smell less sweet? Towards a holistic approach to PERT/CPM,” Project Management Journal 36(1):27–36.
Trypia, M. N. 1980. “Cost minimization of simultaneous projects that require the same scarce resource,” European Journal of Operations Research 5(4):235–238.
Tsai, D. M. and Chiu, H. N. 1996. “Two heuristics for scheduling multiple projects with resource constraints,” Construction Management and Economics 14(4):325–340.
Tsubakitani, S. and Deckro, R. F. 1990. “A heuristic for multi-project scheduling with limited resources in the housing industry,” European Journal of Operational Research 49(1):80–91.