Theory of Constraints Handbook - James Cox Iii [123]
Gupta, S. 1997.” Supply chain management in complex manufacturing”, IIE Solutions March:18-23.
Hall, R. W. 1997. “Just-in-time concepts: Scope and applications,” in Greene, J. Editor. Production & Inventory Control Handbook. New York: McGraw Hill.
Hasgul, S. and Kartal, K. 2007. Analyzing a drum-buffer-rope scheduling system executability through simulation. Working paper. Eskisehir Osmangazi University, SCSC, 1243–1249.
Heizer, J. H. 1998. “Determining responsibility for development of the moving assembly line.” Journal of Management History 4:94–103.
Hilmola, O. P. 2001. “Theory of Constraints and outsourcing decisions,” International Journal of Manufacturing Technology and Management 3:517–527.
Huang, J. Y. and Sha, D. Y. 1998. “Constructing procedures of an effective production activity control technique for a wafer fabrication environment,” International Journal of Industrial Engineers 5:235–243.
Huang, S. H., Dismukes, J. P., Shi, J., Wang, Q. S. G., Razzak, M. A., and Robinson, D. E. 2002. “Manufacturing system modeling for productivity improvement,” Journal of Manufacturing Systems 21:249–259.
Huff, P. 2001. “Using drum-buffer-rope scheduling rather than just-in-time production,” Management Accounting Quarterly Winter:36–40.
Hurley, S. F. and Kadipasaoglu, S. 1998. “Wandering bottlenecks: Speculating on true causes,” Production and Inventory Management Journal 39(4):1–4.
Hurley, S. F. and Whybark, D. C. 1999. “Inventory and capacity trade-offs in a manufacturing cell,” International Journal of Production Economics 59:203–212.
Jackson, G. C. and Low, J. T. 1993. “Constraint management: A description and assessment.” The International Journal of Logistics Management 4(2):41–48.
Kadipasaoglu, S. N., Xiang, W., Hurley, S. F., and Khumwala, B. M. 2000. “A study on the extent and location of protective capacity in flow systems,” International Journal of Production Economics 63:217–228.
Kayton, D., Tayner, T., Schwartz, C., and Uzsoy, R. 1996. “Effects of dispatching and down time on the performance of wafer fabs operating under theory of constraints,” 1996 International Electronics Manufacturing Technology Symposium. Austin, TX, 49–56.
Kayton, D., Tayner, T., Schwartz, C., and Uzsoy, R. 1997. “Focusing maintenance improvement efforts in a wafer fabrication facility operating under the theory of constraints,” Production and Inventory Management Journal 38(4):51–57.
Kim, S., Cox III, J. F., and Mabin, V. J. 2009. “An exploratory study of protective inventory in a re-entrant line with protective capacity,” International Journal of Production Research. Currently available online at http://dx.doi.org/10.1080/00207540902991666.
Kim, S., Davis, K. R., and Cox III, J. F. 2003a. “An investigation of output flow control, bottleneck flow control and dynamic flow control mechanisms in various simple lines scenarios,” Production Planning and Control 14:15–32.
Kim, S. S., Davis, K. R., and Cox III, J. F. 2003b. “Investigation of flow mechanisms in semiconductor wafer fabrication,” International Journal of Production Research 41:681–698.
Klusewitz, G. and Rerick, R. 1996. “Constraint management through the drum-buffer-rope system,” Cambridge, MA. 1996 IEEE/SEMI Advanced Semiconductor Manufacturing Conference. Cambridge, MA, 7–12.
Kosturiak, J. and Gregor, M. 1998. “FMS simulation: Some experience and recommendations,” Simulation Practice and Theory 6:423–442.
Koziol, D. 1988. “How the constraint theory improved a job-shop operation,” Management Accounting 69(11):44–49.
Lambrecht, M. and Alain, S. 1990. “Buffer stock allocation in serial and assembly type of production lines,” International Journal of Operations and Production Management 10(2):47–61.
Lambrecht, M. and Decaluwe, L. 1988. “JIT and constraint theory: The issue of bottleneck management,” Production and Inventory Management Journal 29(3):61–65.
Lawrence, S. R. and Buss, A. H. 1994. “Shifting production bottlenecks: Causes, cures, and conundrums,